The Project

Commissioned by the Electricity and Water Authority (EWA), ESB International is completing power system studies on the EWA transmission network. 

Our shared ambition is to achieve optimal utilisation of its existing and new assets to meet future demand whilst ensuring a safe and reliable power system.

Photograph of a boat statue with a decorative red and white sail. It is on some grass next to a well lit road in a city

Our Approach

  • The Challenge

    Identify areas of most significant impact of transmission network investment to allow EWA to meet projected load growth, guaranteeing long-term system and asset integrity.

  • The Solution

    Planning network expansion projects necessary to reliably support year on year forecasted load growth projections. Use of modern software for steady-state and transient stability studies and contingency analysis from 2015 to 2020.

What we delivered

Graphical image showing a gear and some lines and circles

The following power system studies were undertaken: 

  • Load Flow Studies  
  • Reactive Power Compensation Studies 
  • Short Circuit Studies 
  • System Stability Studies 
  • Transient Voltage Studies 
  • Protection Studies 

 

The Results

Icon of a globe with a circle containing a check mark

  • Identified new network arrangements keeping short-circuit levels within equipment ratings. 
  • Minimised operational limitations while reliably supporting the increased load. 
  • Incorporated a new 400 kV backbone into the transmission system. 

 

Since 1976, ESB International has acted as Resident Consultant to EWA and its predecessors. Throughout this tenure, we’ve worked together completing extensive power system studies comprising of load flow, short circuit and stability studies. ESB International is an integral part of the transmission development in the Kingdom of Bahrain.
Ebrahim Abdula Al Kaabi, Deputy Chief Executive Planning and Projects, EWA Bahrain

Related Case Studies

bahrain

220kV & 66kV Transmission & Distribution Development: Phase 1 & Phase 4

Transmission & Distribution Read Case Study
Photograph of a substation
malaysia

Transmission Substation Development Kulim Hi-Tech Park

Transmission & Distribution Read Case Study
Photograph of two men with their backs to the camera and looking at power lines. They are wearing hard hats and high vis vests with the ESB International logo on the back
tanzania

Tanzania Rural Electrification

Transmission & Distribution Read Case Study

Contact Us

Dublin Office

Address
ESB International,
One Dublin Airport Central,
Dublin Airport Cloghran,
Co Dublin,
K67XF72
Phone +353 1 703 8000 +353 1 703 8000

Bahrain Office

Address
ESB International Office 1002,
Building 655 Road 3614,
Block 436,
Seef Area,
Bahrain
Phone +973 1770 8118 +973 1770 8118

Oman Office

Address
ESB International Office 206,
2nd Floor, Holiday Inn Al,
Mazoon Street South Al,
Mawaleh, Muscat P.O. Box,
P.C 118 Sultanate of Oman
Phone +973 1770 8118 +973 1770 8118