The Project

The Electricity and Water Authority's (EWA) mission is to provide reliable and quality electricity and water supply for the sustainable development of the Kingdom of Bahrain. The Ras Legrain Transmission Development Project connected electricity customers with modern and efficient power generation from the Al Dur phase two independent water and power project (IWPP).

Photograph of some tall skyscrapers taken from the ground looking up

Our Approach

  • The Challenge

    The connection and transmission of new electricity generation to the Bahrain national grid.

  • The Solution

    Constructing a 400 kV 25 Bay GIS switching station and over 80 kilometres of 400 kV underground electric power feeders.

  • What we delivered

    400 kV GIS and Power Cable system – with enhanced end user features including remote control capability from a centralised system control centre and online condition monitoring systems.

The Results

Icon of a globe with a circle containing a check mark

  • 400 kV grid substation connection for the new 1500 MW power plant
  • 80 kilometres of 400 kV feeder installed in challenging routes including the Bahrain oil field 
  • Phased commissioning of the substation to meet a demanding schedule
  • More than 3 million manhours worked without a lost time incident

 

The Details

Graphic icon of a document with a magnifying glass in the top right corner

The ESB International team based in Bahrain at short notice mobilised an experienced team for immediate and rapid action on constructing the 400 kV substation and cable installation.

ESB International planners and designers used their extensive knowledge of the electric transmission and distribution system and other utilities to formulate viable cable routes quickly.

We secured cable route planning, permissions, and construction wayleaves to accelerate the cable installation task through careful consideration and intense stakeholder engagement.

Meticulous planning and continual review coupled with rigorous engagement with the numerous contractors working on the project enabled efficient resolution to the project's plan and engineering challenges.

 

ESB International has made history recently with the energisation of Ras Legrain 400 kV Grid Substation. A fantastic achievement and one delivered on time due to the long and successful experience of the ESB International staff in Bahrain that spans many projects at all voltage levels. Knowledge and expertise solidify our relationship with EWA and once again proves that their trust in us is consistently justified. This project's delivery with a very ambitious target of 14 months, including several challenging 20 kilometre long 400 kV cable routes, is a significant success and well done to all.
Sean Atkinson, Managing Director, ESB International

Related Case Studies

bahrain

220kV & 66kV Transmission & Distribution Development: Phase 1 & Phase 4

Transmission & Distribution Read Case Study
Photograph of a substation
malaysia

Transmission Substation Development Kulim Hi-Tech Park

Transmission & Distribution Read Case Study
Photograph of two men with their backs to the camera and looking at power lines. They are wearing hard hats and high vis vests with the ESB International logo on the back
tanzania

Tanzania Rural Electrification

Transmission & Distribution Read Case Study

Contact Us

Dublin Office

Address
ESB International,
One Dublin Airport Central,
Dublin Airport Cloghran,
Co Dublin,
K67XF72
Phone +353 1 703 8000 +353 1 703 8000

Bahrain Office

Address
ESB International Office 1002,
Building 655 Road 3614,
Block 436,
Seef Area,
Bahrain
Phone +973 1770 8118 +973 1770 8118

Oman Office

Address
ESB International Office 206,
2nd Floor, Holiday Inn Al,
Mazoon Street South Al,
Mawaleh, Muscat P.O. Box,
P.C 118 Sultanate of Oman
Phone +973 1770 8118 +973 1770 8118